[SONGS PLAYING] Hey there. Today, we'' re going to install a brand-new
jet as well as change an old one. This is fairly a simple installation. And also we'' re going to lead you with every step of the way. There'' s also an Use as well as Care handbook that ' s included with the pump as a recommendation. If you require added support, we have an 800 number that you can call for professional service. This is a deep well installation video on wells that are 25 to 70 feet. If you have a shallow well up to 25 feet, you'' ll want to go to the superficial well video. Refer to the checklist at the end of this video for added products and also tools required for the installation.You ' ll see that your convertible jet pump is pre-wired to 230 volt.
However this pump can additionally be wired for 115 volt. So as you comprehend which voltage you ' re mosting likely to need, to alter the voltage to 115, we merely take this leading cover off and we remove it.
There is a selector switch which you can see is already readied to 230-volt solitary phase. To transform this to 115 volt, merely slide the switch. You ' ll see it currently states 115 volt. We can change the cover.
As well as this pump is now operational for 115 volt.
Since we ' ve identified that the depth of your well is higher than 25 feet, we need to convert this shallow jet well to a deep .And the reason that we do that is we ' re going to take this ejector off of this pump. As well as this is mosting likely to go into the well. The ejector will certainly help to push water right into the pipeline, rather than pull it.
So what we ' re going to do is we'' re. going to start removing this ejector. As well as it ' s very straightforward since you ' re. going to take an adjustable wrench, loosen these screws below. And also we have one on each side. Use caution when you ' re removing it. There ' s some gaskets and also. it is'a little heavy.And you ' re mosting likely to.

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

draw it directly out.
There ' s a gasket that. holds that in location. You'' re not going to require that. You ' re mosting likely to establish.
that off sideways. This is a venturi that'' s created. for the shallow well that ' s inside this ejector. We ' re going to eliminate this. one, merely by unscrewing it. As well as this is the ejector. And also we'' re mosting likely to place in
. a longer ejector that'' s going to enter into the deep well pipe. And you simply just slide
. that into the ejector, and you'' re going
to. tighten it back down. And as you can see, good as well as tight. So this is mosting likely to go.
right into the well itself. Our pump now has been.
transformed to a deep . If there'' s any kind of questions.
pertaining to this, you can likewise go to the.
Use and Treatment Overview. And also there'' s an in-depth.
description of how to do this. Now, we'' re prepared
to get rid of. the old deep .
So first points you. want to make certain you do is comply with all local and also. state codes, so that we'make certain that we ' re

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

in compliance.The following action is see to it you closed.
off all electrical energy to the pump. And also you can do that.
by either turning off your home breaker or the disconnect. And also make certain there'' s no electric. power coming in the pump. You also wish to shut down.
all water going to the pump as well as coming out of the pump. So if you have a shut-off.
shutoff, just closed the water off to ensure absolutely nothing is making it through. The next thing we want.
to do– the following step is we intend to eliminate these plugs.
right here, to eliminate pressure from the pump as well as simply make use of a pipeline.
wrench to eliminate it. And that'' ll relieve.
stress in the pump. And afterwards the following point is.
we have a drain plug here. Ensure you have a mug so.
that you can catch the water. Simply get rid of the drain plug. Permit the water to drain.
out of the housing.You can put that back in. And also currently, we ' re ready to. start getting rid of the pipe.
To get rid of the pipeline, you should. have a disconnect that ' s here. And also this'– we ' ll remove to'the storage tank. Merely unthread it. You could need to have a.
monkey wrench to do that. As well as we'' ll detach it there. The following step is to eliminate it from the.
deep well pipelines coming right into the home. As well as for simulation purposes,.
we'' ve established this assembly. You simply eliminate the intake. And also you get rid of the lower portion. As well as these are all going. As well as they have water in the piping,.
so they'' re all mosting likely to the well. Once you'' ve done that, you. should have the ability to separate it. Now that we separated the.
piping, we have one last action. Which'' s to get rid of the stress. switch and also the electrical cords, so the pressure switch.
So we ' re going to merely. take this nut loose. Which must unthread. And also we have'2 cables that ' ll been available in.
That ' s your incoming power. together with the ground.
Just just remove those. cables for those screws.
Now, we ' ve eliminated the.

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

electrical energy from this pump.We can now install the brand-new one.
So we ' re going to remove. this off the beaten track. Currently that we ' ve assembled the. ejector as well as the venturi with each other, I ' m actually mosting likely to mimic exactly how. you would certainly place this into the deep well. Therefore for illustration objectives,.
we'' ve established a piece of pipe. This already has Teflon.
tape on each end. You'' re mosting likely to thread this. directly right into the ejector.
As well as we ' re mosting likely to make. sure it ' s great and limited. These fittings below should. have already been glued. After that we ' re going to put a foot valve in. As well as this foot valve will actually maintain
. water distant to the pipe. Now, remember this deep well.
can be as much as depths of 70 feet. So we wish to make certain that.
we placed in a brand-new foot shutoff to hold the water in the pipeline, so.
it doesn'' t return into the well.And we'' re going to make
sure we tighten. that down with an excellent pipe wrench, so every little thing must be good and tight. Now, it'' s time to set up the. discharge piping as much as the pump. And how that'' s going'to function is. allow ' s start with the little suitable below that I ' ve already set up. As well as an inch and also a 1/4 fitting. The inch and 1/4 installation is going.
to go right over top of the venturi. Just be careful when you install it. And also it'' s mosting likely to thread. right into the ejector. As well as once again, with Teflon.
tape currently there. And also make sure it'' s good and also tight. After that we ' re going to.
set up the 1-inch piping. As well as the 1-inch piping.
is going to go directly right into the ejector and string in as well. As well as your assembly will look.
something extremely comparable to this. Currently, keep in mind, this is a tiny.
part for simulation objectives. This could be as deep as 70 feet. So you wish to ensure.
that as you'' re going to mount this into
the well pipe,. that you have something to hold it on.So you can clamp it to keep.
it from dropping in the well. Because if it falls under a.
well, you'' ve obtained an actual concern. So you wish to ensure.
everything is great as well as tight. As well as you'' re going to go down.
it right into the well. And this is type of the.
assembly that'' s going to be going to the . We ' re all set to set up the
. brand name new deep . So to do this– once again, make certain you'' ve reviewed the Usage– Care guidebook. And also we'' re mosting likely to establish this up. I'' ve already produced some additional.
piping to save time, so you can see.This will

Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

be mosting likely to.
the deep well piping. So if you remember, we.
removed this earlier. I'' m mosting likely to turn this right here. And also the very first point we wish to.
do is set up the 1-inch pipeline. I'' ve currently placed Teflon tape on this. So you intend to make certain that.
you obtain it great as well as covered, so we wear'' t get
any type of. air leakages whatsoever. The following step is to install.
the 1 and a 1/4 inch. And this is mosting likely to be going.
to the intake of the pump. Once those are done, currently we'' re all set. to mount it onto the well assembly. And also extremely merely, we ' re just going to. adjust it to make certain that it fits. All the fittings exist. And make our links. We want to make sure. whatever is excellent and limited which all the installations are secure.We want to see to it there'' s. no leak whatsoever. So currently, there'' s one added. thing we need to do. Due to the fact that this pump will.
change as a shallow jet well pump and we converted it.
to a deep well, there'' s a couple points we need to eliminate. One of them is this air vent tube that'' s. coming from the stress switch. We require to eliminate this plug below. You'' ll simply squeeze that. Draw television off. Utilizing a pipeline wrench, we'' re. going to loosen this. This is in fact mosting likely to go into a.
stress regulator, which is consisted of in the box of the convertible jet. We'' re going to thread that in there.And this is– going to.
sit this off sideways, due to the fact that we'' re utilizing the moment. And also next point we require to do.
is install the stress switch. It'' s mosting likely to go specifically. into the very same location. I ' ve currently
placed Teflon. tape on it to thread it right into the new transformed . So once we'' ve done that, this portion of.
the piping is finished up to the well. We currently need to prime it. So we'' re mosting likely to fill this
. housing completely with water and enable the water ahead.
all the way through the pipe. As well as we'' re also– if we require to– remember, this is our link.
for the deep well piping. We'' ll fill it up with water.
as well so that the pump is entirely all set for priming. Now that we'' ve primed.
the pump with water, you wish to make certain you look.
down into the real estate to see if there'' s any kind of bubbles

coming up.If you see any bubbles, that implies.
there might be air in the piping. You intend to make certain.
it'' s totally safe and secure. Whatever ' s tight.
Yet we ought to be able to see. the water just standing still, right at'the top of the pump.
So if that ' s done, currently we ' re ready. to install the stress regulator. Once again, this is utilized for.
the deep well installation. Stress regulator– we ' re. mosting likely to thread it straight into the top of the pump.
And also you intend to utilize an. adjustable wrench or pipeline wrench to obtain a great, protected fit. And I make use of Teflon tape to.
see to it it'' s still around– I hadn'' t included that. The next point you want to.
do is add the pressure button tubing to the base of the fitting. As well as it'' s going to
squeeze. on there that way. And afterwards you can really pull that up. Therefore this must be.
great as well as tight, protected. See to it there'' s no kinks or bends.
in this piping or this tubes. If you do, then you can have.
a problem with the stress button acting erratically.So you wish to make certain. that ' s good
as well as connected. Whatever there is solid as well as tight. The next step we ' re going to do is. set up the piping mosting likely to the container. And also I ' ve currently produced.'an assembly through– by utilizing the exact piping that we. had before to secure the old pump. And so we ' re going to put. that onto this device.
As well as string it in excellent and also limited. Again, you should have utilized cleaner. as well as glue on the metal installation.
The exact same point right here. We ' re going to be making use of glue and also cleaner.
to make certain that it'' s great and also safe and secure. As well as the last step will be.
connecting this device to the tank.And we have a slip fitting.
that we'' ve used prior to. We'' re going to glide that there. And also it must be able to.
connect good and conveniently. And also again, by utilizing the existing pipeline.
details, the links and whatever, you should get a great fit. So use that and the.
old piping as an overview. See to it it'' s great as well as limited. Inspect everything.
See to it everything is. excellent and also limited and also sealed. Once more, no air leaks. The following step'will certainly be– we ' re mosting likely to need to. link electrical power.
To do this, you simply. remove this cap right here.
And so this is currently subjecting the. inside of the stress switch.
I went ahead and. pre-installed the grommet. The grommet is mosting likely to snap in right here. But initially, we intend to make certain.
we connect the ground wire. And also the ground cord.
is going to hook right into the ground pin at the bottom.And screw that in

great as well as limited. Then you have two cables below. from the electric home
. And the second cord now will finish. our connection on the electric side. And also always keep in mind to. examine your electric code for state and also regional demands. and also look for electrician help
if required. Now, we ' re mosting likely to. put simply the grommet in to see to it we have a good, limited seal. We wear ' t desire anything. entering there.
And also we installed a cap. And also the pump is currently. prepared for electrical power.
Since our electrical is. linked, every little thing is all set to go. And we can begin to examine the pump. Once again, ensure that when you check. right into the electrical power of your pump
, that you absolutely do have. a 230-volt system.
The pump is a pre-wired. 230 volt.
If it is 115, undergo the steps offered previously on.
how to transform the pump to 115 volt. So every little thing prepares to go. We intend to, once more, ensure that.
there'' s– all the links are limited. The electrical power is linked, as well as all.
televisions as well as points are all set to go.And then we have no.
air leaks whatsoever. Currently, exactly how we'' re going to prime the
. pump and also examination the pump to see to it every little thing is working– we'' re going. to go as well as open up a faucet about a 1/4 of a turn. That will certainly leave air out of the system. And also we'' re going to turn the pump.
on, transform the power on. As well as the pump should run in prime. Thanks for seeing.
this setup video. And also if you complied with the steps.
properly, congratulations. You are up and running. For additional information, you can.
referral your Usage and Care guidebook that was given with the item. [MUSIC PLAYING]

As found on YouTube

Free Coupon Download; Up To 80% OFF

No response yet on Deep Well Pump | Everbilt Jet Well Pump Installation | The Home Depot

Leave a comment

will not be published

Touch to Call!
Call Us
%d bloggers like this: